Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Oct 31, 2022     rt wing leading edge cleco'd and starting to align for top nose rib drilling - (2.5 hours)       Category: Wings
Finished deburring all of the lower drilled leading edge holes (both inside and outside skin).
Charlene helped me by holding the leading edge in place while I clecoed the lower side across the spar and lower nose ribs.
I have temporary flat rivets (just normal A4 and A5 rivets but squeezed with a flat nose riveter) in place on the upper spar so i can now lay the skin down over them to pull the leading edge skin tight for alignment, then I'll be able to start drilling the upper nose rib holes and eventually the spar afterwards. I inserted the rear spar blocks (wood blocks) inline with the straps so it wouldnt' crush the rear spar flanges together with the straps and put cardboard between the strap front leading edge and under the strap metal parts and cranked them down a little (will crank them tighter the next time before drilling).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.